About us   |  

HDPE CORRUGATED PIPE/

PP Plastic Inspection Well

Product Name
Inspection Chamber
 
Capacity
DN315mm-1000mm
 
Material
HDPE+PP
 

 Color

Black
             
 Supply Ability
10000 Sets per Month
               
Style
Underground
 
Type
Sewer

Send Inquiry

Send Inquiry

    Live Chat
    • Product Details
    • Packing & Delivery
    • Our Exhibition
    • Our Certifications
    • Our Company
    • FAQ

    Plastic manhole is usually called “inspection well”, which is placed at interchange and turning point of drainage pipes, changes and plunge of caliber or slope, and in straight pipe at each certain distances. It is an affiliated drainage structure used to check, clean and dredge the pipes regularly. Our plastic manhole is made of Polymer Resin, adopts combinative structure and consists of manhole base, manhole shaft, manhole cover, cover base and concrete supported plate, etc. The critical manhole base adapts one-time molding, which can produce all types of manholes for two-way, three-way, Cross Tee 90°-165°any interchange. It uses reduce union, variable angle union and seal ring to change the connection of caliber and angle. Our manhole shaft uses PE pipe, corrugated pipe or winding pipe to adjust itself, so it is very much flexible, we can intercept the corresponding length according to the site buried length. We use rubber seal ring at the connection of manhole shaft, inlet (outlet) pipe and manhole base, so that small inner angle changes can be made. Wholesale best price high quality HDPE Plastic inspection Well.

    PP Plastic Inspection Well  Benefits:

    No leakage, sealed connection between pipe and well.

    Easy to carry and fast construction.

    Corrosion of acid and alkali resistant media, long service life.

    Convenient pipeline clearing, minimal maintenance.

    Small footprint,small excavation area.

    Cost-effective and strong carrying capacity.

    Environmentally friendly building materials, recyclable.

     

     

    PP Plastic Inspection Well  Application:

    1.Well pit and foundation

    1)Pave the bottom of the ditch with appropriate fine sand or plain soil, and level it.the pit depth is determined according to the axial line of the pipe and the axial line of the well joint.

    2)Ditch bottom leveling.

    3)1 meter inspection well, two people can easily put into the trench.

    2. Inspection well connection pipe installation instructions

    4) Measure the depth of the inspection well with a tape measure with a precision of 1 mm, Drawing line on the corresponding pipe sockets as mark, and install a suitable rubber sealed loop between the first and second peaks of corrugated pipe socket end. The pipe must be inserted into the marking position when assembling.

    5) In order to make the installation easier, it is necessary to apply a lubricant (such as soapy water, detergent, etc.) evenly on the outer surface of the seal ring on the pipe and the inner surface of the inspection well socket.

    6) Pull the pipe into the well seat socket with a tightener, pull in the depth to the marking mark on the pipe, pull the wire tightener, and after confirming the link in place, correct the well seat again with the level.

    3.  Pitshaft installation

    7) The length of the pitshaft should be the height from the bottom of the wellhead to the design ground minus the height from the top of the pitshaft to the ground. When the surface or pavement elevation is difficult to determine, the appropriate margin can be left.

    8) Special tightening tools should be used when inserting the pitshaft, and do not hit it with heavy hammer and keep it vertical.

    4. Backfill

    9)  Linking the pitshaft to the well block.

    10) Working in the ditch.

    11) Installing the manhole cover.

    5.Manhole cover installation

    12) Symmetrical backfilling of fine sand or plain soil.

    13) Compaction after backfilling.

    14) Lift the pressure ring into the pitshafte to be installed, gently lower the axial line of the pitshaft (manually corrections is allowed if necessary), install the manhole cover on the pressure ring and backfill it until completion.

     

    Products Description

     

    JK-315
    Category Support pipe type Weight
    (KG)
    Weigh
    (KG)
    Category Support pipe type Weight
    (KG)
    Weight
    (KG)
    Start well 200A(237mm) 2.5 2.89 90° 200A(237mm) 2.98 3.33
    200B(208mm) 2.5 2.82 200B(208mm) 2.83 3.56
    225A(266mm) 2.86 3.14 225A(268πm) 3.4 3.76
    Straight-way 200A(237mm) 2.99 3.33 45° 200A(237mm)
    200B(208mm) 2.84 3.19 200B(208πm)
    225A(266mm) 3.5 3.77 225A(266mm)
    Three-way 200A(237mm) 3.37 3.76 Four-way 200A(237mm) 3.75 4.2
    200B(208πm) 3.17 3.56 200B(208πm) 3.78 3.93
    225A(266mm) 3.99 4.38 225A(266πm) 4.55 5
    JK-450
    Category Support pipe type Weight
    (KG)
    Weight
    (KG)
    Category Support pipe type Weight
    (KG)
    Weight
    (KG)
    Start well 200A(237mm) 5.05 5.7 90° 200A(237mm) 5.35 5.7
    225A(266mm) 4.6 5 225A(266πm) 5.2 5.6
    300A(354πm) 5.5 6.2 300A(354πm) 6.6 7.2
    Stiaicht-way 200A(237mm) 5.35 5.7 45° 200A(237πm)
    225A(266mm) 5.2 5.6 225A(266πm)
    300A(354mm) 6.5 7.5 300A(354mm)
    Three-way 200A(237mm) 5.5 5.7 Four-way 200A(237mm) 5.95 5.67
    225A(266mm) 5.7 6.1 225A(266mm) 5.95 6.7
    300A(354mm) 8.15 8.17 300A(354πm) 8.6 8.57
    JK-630
    Category Support pipe type Weight
    (KG)
    Weight
    (KG)
    Category Support pipe type Weight
    (KG)
    Weigh
    (KG)
    Start well 200(240mm) 8.5 9.9 90° 200(240mm) 8.8 10.3
    225(268mm) 8.7 10 225(268mm) 9.2 11.2
    300(354mm) 10.4 11.5 300(354mm) 11.1 12.4
    400(473mm) 12.1 13 400(473mm) 13.8 14.8
    Staight-wa 200(240mm) 8.9 10.3 45° 200(240mm)
    225(268mm) 9.3 10.6 225(268mm)
    300(354mm) 11.3 12.4 300(354mm)
    400(473mm) 13.9 14.8 400(473mm)
    Three-way 200(240mm) 9.2 10.7 Four-way 200(240mm) 9.6 11.1
    225(268mm) 9.8 11.2 225(268mm) 10.4 11.8
    300(354mm) 12.1 13.3 300(354mm) 13 14.2
    400(473mm) 15.7 16.6 400(473mm) 17.5 18.4
    JK-700
    Category Support pipe type Weight
    (KG)
    Weight
    (KG)
    Category Support pipe type Weight
    (KG)
    Weight
    (KG)
    Start well 200(240mm) 9.1 10.5 90° 200(240mm) 9.5 10.9
    225(268mm) 9.3 10.6 225(268mm) 9.8 11.2
    300(354mm) 9.9 11 300(354mm) 10.6 11.9
    400(473mm) 12.6 13.5 400(473mm) 13.8 15.3
    trai Wa 200(240mm) 9.5 10.9 45° 200(240mm)
    225(268mm) 9.9 11.2 225(268mm)
    300(354mm) 10.8 11.9 300(354mm)
    400(473mm) 14.5 15.3 400(473mm)
    Three-way 200(240mm) 9.8 11.3 Four-way 200(240mm) 10.2 11.7
    225(268mm) 10.4 11.8 225(268mm) 11 12.4
    300(354mm) 11.5 12.8 300(354mm) 12.5 13.7
    400(473mm) 15.7 17.1 400(473mm) 17.5 18.9
    JK-1000
    Category Support pipe type Weight
    (KG)
    Weigh
    (KG)
    Category Support pipe type Weight
    (KG)
    Weigh
    (KG)
    Start well 300(354mm) 21.3 25.2 90° 300(354mm) 21.7 25.5
    400(478mm) 25.3 27.3 400(478mm) 26.2 28.1
    500(583mm) 27.3 29.3 500(583mm) 28.8 30.8
    600(703mm) 31.4 35 600(703mm) 34.37 38.2
    800(951πm) 40.2 43.2 800(951mm) 46.1 49.1
    Sraight-way 300(354mm) 21.7 25.5 45° 300(354mm)
    400(478mm) 26.6 28.1 400(478mm)
    500(583mm) 28.8 30.8 500(583mm)
    600(703mm) 35.5 37.86 600(703mm)
    800(951πm) 47 50.1 800(951mm)
    Three-way 300(354mm) 22.1 25.9 Four-way 300(354mm) 22.4 26.2
    400(478mm) 27.9 28.9 400(478mm) 28.27 29.7
    500(583mm) 30.3 32.3 500(583mm) 31.7 33.8
    600(703mm) 38.5 41.6 600(703mm) 40.1 42.9
    800(951πm) 52 55 800(951mm) 57 60

    Get a Quote

      Packing Details: Our PP Plastic Inspection Well are securely packed in containers or as per customer requirements, ensuring they reach you in perfect condition. We use robust materials for packaging to protect the PP Plastic Inspection Well during transit, accommodating various sizes and quantities.

      Delivery Details: We guarantee a swift delivery process, with orders being dispatched within 15 days following payment confirmation. Our efficient logistics network ensures your order arrives promptly and safely, regardless of your location. We strive to meet tight deadlines while maintaining the highest standards of service and product quality.

      Below is our detailed picture

      Our company actively participates in renowned building materials exhibitions around the world each year, including the Saudi Building Material Exhibition, Cambodia Building Material Exhibition, and Vietnam Building Material Exhibition, showcasing our innovative products in the industry. On these international stages, we not only present our state-of-the-art building materials and technologies but have also successfully established close cooperative relationships with clients globally.

      We warmly welcome partners to collaborate with us. You will benefit from industry-leading products, innovative solutions, and professional service support, exploring broader market opportunities together for mutual benefits. Let’s join hands in cooperation to create a better future!

      Our Exhibition

      Our Exhibition

      Our Exhibition

      Our Exhibition

      Our Exhibition

      Our Exhibition

      Located in Zhengzhou,Henan province,China,Henan Hesu Group Co.,Ltd was originally established in 1998 and started its 1st step of export in the year of 2007. Henan Hesu Group Co., Ltd.,a high-tech enterprise dedicated to the the production and sales of the new plastic pipe and providing professional and complete pipe solution.

      Our company persists in the core values of “integrity’ and which adheres to the corporate tenet of “realistic innowation, serving the society” . The company insist on positioning the high-end market and provides healthy and green quality life for the majority of users.

      True to its core value of “integrity”, Henan Hesu Group Co., Ltd. is committed to becoming a world-class material provider, and which adhere to the corporate tenet of “realistic innovation, serving the society”. We insists on positioning the high-end market and provides healthy and green quality life for the majority of users.

      Q:What are the three types of PP Plastic inspection Well?

      A:PP Plastic inspection Wells can be divided into ordinary wells, water seal wells and drop wells by function; and into straight wells, elbow wells and three-way wells by external shape.

      Q:How to measure the depth of PP Plastic inspection Well?

      A:The depth of the PP Plastic Inspection Well can be measured using tools such as a laser rangefinder, a tape measure, and an ultrasonic detector.

      Q:How long does PP Plastic inspection Well last?

      A:The service life of PP Plastic Inspection Well is 50 years under standard use, but it will be affected by factors such as the environment and installation quality.

      Q:What level of PP Plastic inspection Well?

      A:When used in a construction area, the depth of the PP Plastic Inspection Well will be less than 6m. Municipal wells will be deeper. If you have a fixed requirement, you can directly choose to customize the corresponding depth grade of pipes.

      Q:Does PP Plastic inspection Well float or sink?

      A:The density of PP Plastic Inspection Well is close to that of water, but it usually sinks to the bottom due to its own structural reinforcement. In practical applications, it needs to be fixed to prevent floating.

      Prev:

      Next:

      Leave a message